UK5 Transparency Notice Tracker

Monitors UK5 transparency notices published on Find a Tender under the Procurement Act 2023. Tracks the direct award justification relied on under Schedule 5, whether each notice was published before the contract was entered into as s.44(1) requires, and the volume and value of direct awards by contracting authority.

Checking fts-harvester…
Loading… data is sourced from fts-harvester's pre-harvested store (shared with the Late Publication Tracker) and filtered to UK5 notices client-side.

Volume and concentration

How many transparency notices, and which organisations account for them. Why they say it happened is on the Justifications tab, which carries the category breakdown and the quality mix.

Transparency notices by month

Based on the date each notice was published. Watch for whether recent months are trending up or down, and whether reason quality (see above) is improving or worsening alongside any change in volume.

Most transparency notices, by organisation

Top organisations by transparency notice count in the current results. Full detail on the Contracting authorities tab.

Direct award justifications

Every category in the table below, as a share of all transparency notices in the current results. The taxonomy is a keyword heuristic, not an authoritative classification — a starting point for investigation, with the raw text shown alongside on the Notices tab so it can be checked.

Justification quality

Missing: no justification given at all. Vague: a justification given, but short or boilerplate (e.g. "commercial reasons"). Adequate: a substantive, specific reason. A high missing/vague share suggests authorities aren't meeting the spirit of the publication duty even where a notice is technically filed.

Direct award justifications

Reason text is matched against a keyword taxonomy — treat this as a starting point for investigation, not a definitive classification. Every row links through to the underlying notices so the raw text can be checked.

CategoryNoticesShare

How notices are detected and counted

Detection note: UK5 releases are identified from documents[].noticeType === "UK5" only. There is no OCDS status or tag meaning "transparency notice", and inferring one from procurementMethod would sweep in every direct award whether or not a notice was published — the opposite of what this measures. If FTS changes how it types these, notices will be missed: treat counts as a lower bound, never a ceiling.

Counted once per transparency notice. Versions of one notice are collapsed on the procurement identifier — Find a Tender gives an edited notice a new reference, so the reference cannot be used for this. Separate notices reporting the same transparency notice are collapsed on content: same authority, title, date, value and reason. Both are marked on the row (v2, ×6) with the folded-in references on hover, so any collapse can be checked against the source.

Central government status. For goods and services, Schedule 1 sets one threshold for central government authorities and a higher one for everyone else — \u00a3135,018 against \u00a3207,720 — so which applies decides the answer. It is resolved against the statutory test first — reg 44(1) of SI 2024/692 specifies the Crown and the entities listed in Schedule 2 to those Regulations, and reg 44(2) deems a successor entity included, which matters because several listed departments have since been renamed. Find a Tender's own classification is used only where the name does not resolve, and each row's tooltip says which source decided it. Where neither resolves, the row is reported as cannot be determined: absence from a list is not proof of absence from the category, and guessing would move the threshold by more than half.

This sat above the tabs, where it was the first thing on the page and the least likely to be read at the moment it mattered. It belongs beside the Legislation tab: both answer “what does this page actually measure”, which is a question people ask after seeing a figure rather than before.

What this tracker tests, and what it cannot

Every provision below links to legislation.gov.uk. The wording here is a summary — read the Act for the text that binds.

The most serious breach is invisible to this tool. It reads notices that were published. A contracting authority that makes a direct award and publishes no transparency notice at all leaves nothing here to count — there is no record to find. So a low count of late notices is not evidence of compliance, and this tracker cannot be used to say an authority complied. It can only show that a notice which exists arrived after the contract it was supposed to precede.
ProvisionWhat it saysHow this tool uses it
s.44(1)
Transparency notices
A contracting authority must publish a transparency notice “before awarding a contract under section 41 or 43”. The one compliance test here. The notice's publication date is compared with the earliest contract signature date published for the same procurement. Before the signature meets the duty; on or after it does not.
s.44(2) A transparency notice states that the authority intends to award a contract directly, together with whatever further information regulations under s.95 require. The justification text is read and classified. This tool does not check the notice against the full content requirements in the regulations — that is a different question and a different tool.
s.44(3) The duty does not apply to a s.41 award made by virtue of paragraph 15 of Schedule 5 (user choice contracts). Notices classified as paragraph 15 are shown as outside s.44 and their timing is never counted as a breach.
s.41
Direct award in special cases
Permits a direct award where a direct award justification in Schedule 5 applies. One of the two routes s.44(1) names. Notices citing it are in scope.
s.42
Direct award to protect life, etc
A separate power to award directly to protect life and in comparable circumstances. Not named in s.44(1), which lists only sections 41 and 43. But reg 26 requires a transparency notice to record whether the award is being made under s.42, so notices plainly are published for these. They are categorised and timed here like any other; if you need to rely on whether s.44(1) itself compels one, read the Act rather than this page.
s.43
Switching to direct award
Permits switching to a direct award where a competitive tendering procedure produced no suitable tenders or requests to participate. The second route s.44(1) names. In scope.
Schedule 5
Direct award justifications
The grounds themselves: prototypes and development (paras 2–3), only one supplier (4–6), additional or repeat supplies (7–9), commodities (10), advantageous terms on insolvency (11–12), urgency (13–14), user choice (15–17) and defence and security (18–20). The justification taxonomy on the Justifications tab follows these paragraph numbers, so a category can be checked against the Schedule directly.
Commencement s.44 came into force on 24 February 2025 (SI 2024/716). The harvest starts there. Nothing earlier is in scope, and contracts procured under the 2015 regulations are a separate regime entirely.

The Procurement Regulations 2024 (SI 2024/692)

Only the regulations that bear on a transparency notice itself — what it must contain, how it is published, and whether it is required at all. Regulations governing other notice types are left out.

RegulationWhat it requires of a UK5How it relates to this page
reg 26
Transparency notices
Sets out the information a transparency notice must include, in addition to the baseline required of notices generally. Among it: the Schedule 5 direct award justification relied on and an explanation of why the authority considers it applies; whether the award is being made under s.42 to protect life; whether the contract is a special regime contract (concession, defence and security, light touch or utilities); whether it is being awarded to an excluded supplier; and the unique identifiers for the procurement, contract and supplier. reg 26(3) permits an authority to publish more than the minimum. Read this alongside every verdict here. This tool tests timing against s.44(1) and nothing else. A notice published before its award can still fall short of reg 26 — most obviously by naming a ground without the explanation reg 26 requires. A “before award” verdict is not a finding of compliance with reg 26.
reg 5
Publication on the central digital platform
The notice must be published on the central digital platform. Why Find a Tender is the population. This page reads the platform's own OCDS feed, so a notice published as required is in scope — and one never published is invisible, which is the limitation set out above.
reg 8
Unique identifiers
The identifiers a notice must carry for the procurement, the contract and the supplier. reg 26 makes its own allowance where an urgent award under Schedule 5 paras 13–14 is made before the supplier has been allocated one. What makes the timing test possible. The transparency notice and the later award notice are matched on the shared procurement identifier. Where that link is missing or broken the two cannot be compared, and the row is reported as not assessable rather than assumed compliant.
reg 13
Contracting authority information
Information identifying the contracting authority, carried by the notice. The authority name every row is grouped and counted by. Reproduced here, not tested.
reg 14
Contract subject-matter
How the subject-matter of the contract is described in the notice. The contract title shown on each row. Reproduced here, not tested.
reg 43
Disapplication: regulated health procurement
Disapplies these transparency provisions in relation to regulated health procurement, so no transparency notice arises for it. A hole in the population, not an absence of activity. Health direct awards run under the Provider Selection Regime and never appear here. Counts on this page are not a picture of direct awards across the public sector.

The contract signature date this page compares against is not a UK5 requirement at all — it comes from the contract award or contract details notice published later for the same procurement, under reg 27 or reg 35. Where neither has been published, the timing cannot be established. Links go to the made instrument, SI 2024/692.

How each verdict is reached

VerdictWhat it means, and what it rests on
before award The notice was published before the earliest contract signature date published for that procurement. Where a procurement has several contracts the earliest is used, because the duty bites at the first award — testing against a later signature would let a late notice pass.
after award The notice was published on or after that signature date. The day count is the gap. Both dates come from published notices; neither is inferred.
not assessable No UK6 or UK7 stating a signature date has been harvested for the procurement, so the comparison cannot be made. This is a real answer, not a hedge: calling it compliant would flatter, and calling it a breach would accuse on absent evidence.
outside s.44 A user choice contract under paragraph 15 of Schedule 5, which s.44(3) removes from the duty.

Justification categories are a keyword heuristic, not a legal classification. Categories marked ≈ were matched on vocabulary rather than a recognised phrase. Neither is a finding that the ground was properly relied on — only that the notice used language associated with it. The justification text is shown in full on every row so it can be read rather than taken on trust.

Transparency notices by contracting authority

Organisations publishing repeated UK5 notices may indicate planning failures, unstable specifications, or systemic issues worth scrutinising.

OrganisationNoticesMissing/vague justification

Transparency notices

Type:
Schedule 1:
s.44(1):
Show:
Organisation Title Published Schedule 1 s.44(1) timing Value Direct award justification Category Quality Notice